Phuong Duc · South Hanoi · 71.3 ha

A new-generation industrial cluster for SMEs in South Hanoi

Land inside Hanoi, plots from 2,000 m², shared facilities like an industrial park – start production faster with less capital.

71.3 ha
Total cluster area
0.3–2 ha
Flexible plots, ~2,000 m² modules
4 storeys
Maximum building height
≤ 18 months
Infrastructure completion commitment

Why Hanip 1

Not just a plot of land – a platform that makes it easier for SMEs to expand production in Hanoi

01

Land in Hanoi

Close to owners, customers and goods flows into the city. Lower recurring logistics costs.

02

Small plots, easy to expand

~2,000 m² modules, combinable into 0.3–2 ha plots to match each company’s budget.

03

Full facilities

Shared cold storage, warehouses, forklifts, training and recruitment – pay as you use.

04

Fast start-up

Ready-built factories and warehouses, plus support with permits, design and fire safety – like an industrial park.

Products

Choose the right size, pay only for what you use

All products
Render of factory plots

Industrial land

~2,000 m² modules · 0.3–2 ha plots · Up to 4 storeys

Ready-built factory and warehouse with container trucks

Ready-built factories & warehouses

RBF/RBW 1,000–3,000 m² · Move in fast, lower upfront capital

Shared sports and green area

Shared facilities

5% of land for pay-per-use facilities: warehousing, forklifts, training

Also: Service land · Business support services

Hanip 1 location map: DT429, National Highway 1A, Phap Van–Cau Gie Expressway, North–South high-speed rail, Ring Road 4, Van Diem port
Existing infrastructureLong-term infrastructure (planned)

Location & connectivity

Within 30 km: the Hanoi market and the Dong Van ecosystem

Dong Van I–III industrial parks are 22–30 km away and highly occupied, creating demand for tier-2/3 suppliers, support warehouses and mid-size firms.

IN USE TODAY

Existing infrastructure – ready to use

Road DT429Northern boundary
Main access; goods consolidation, workforce, trucks
Upgraded craft villages, SMEs, material stores, packaging
Phuong Duc – Van Hoang RoadWestern boundary · 24 m
Western access; gates and traffic routing
Local operations, access to workforce
National Highway 1ANorth–south axis to the east
Freight route to Hanoi, Ha Nam, Nam Dinh and Ninh Binh
Consumer goods, mid-size manufacturing, transit warehouses
Phap Van – Cau Gie ExpresswayNorth–south axis to the east
Fast link to Ha Nam and Hanoi’s southern gateway
Dong Van suppliers, material stores, express delivery
Phu Xuyen StationExisting North–South railway
Nearby station on the North–South line
An additional rail freight option
Van Diem PortRed River port
River port east of the site
An additional waterway transport option
View map & connections

Distances to markets and industrial parks

AreaDistanceMain routeValue
Thanh Tri~20 kmDT429 → NH1A / expresswayClose to South Hanoi logistics
Hoang Mai~25 kmDT429 → NH1A / expresswayDeliveries into southern Hanoi
Duy Tien / Dong Van~20–30 kmDT429 → NH1A / Phap Van–Cau Gie ExpresswayLink to Ha Nam’s FDI industrial parks
Phu Ly~30 kmNH1A / expresswayServes the Ha Nam manufacturing corridor
Hung Yen (south-west)~35–50 kmRing roads / South-east Hanoi linksSupports industrial linkages
Nam Dinh~55 kmNH1A / North–South ExpresswayLink to southern consumer markets

Approximate distances from the project information pack.

4 long-term infrastructure drivers

Location value grows with every major infrastructure project

Today, tenants already use DT429, NH1A and the Phap Van–Cau Gie Expressway. In the long run, the four projects below make South Hanoi the meeting point of a regional ring road, high-speed rail, aviation and a new urban axis.

The investor view
01

Ring Road 4 – Capital Region

Once complete, extends regional reach to Hung Yen, Bac Ninh and western Hanoi.

Value for businesses
Direct access to Bac Ninh–Hung Yen supply chains without crossing the city centre.
02

North–South high-speed railway

The route corridor runs along the site’s eastern boundary.

Value for businesses
A long-term position on the national backbone; easy access for experts, partners and customers.
03

South Hanoi international airport

The planned airport site lies south of the project.

Value for businesses
Once built: air logistics and easier access for experts and FDI investors.
04

Ngoc Hoi – Phu Xuyen axis

South Hanoi’s urban–industrial development axis.

Value for businesses
Over time, more residents, services, logistics and supporting industries around the site.

Long-term projects are shown per planning orientation; exact timing and location follow official announcements. [Update each project’s official status before publishing]

Master plan

8 functional zones in one cluster

Click each zone to view renders and details.

Render: Production & warehousing

Production & warehousing

13 sector-based blocks; flexible plots, truck roads, loading, delivery, support warehouses and room to expand.

On-site facilities

Shared like an industrial park, pay as you use

Companies don’t need to invest in their own warehouses, forklifts or meeting rooms – and workers have food, healthcare and sports on site.

Shared operations

Shared racked warehouse
Shared warehouse
Short-term storage, consolidation and labelling for peak seasons
Forklift
Forklifts & handling
Hourly rental for inbound and outbound loads
Truck scale
Electronic truck scale
Shared weighing for incoming and outgoing trucks
Meeting room
Meetings & training
Shared meeting, training and recruitment rooms

Workforce amenities

Dining area
Canteen & dining
In the 4-storey service centre
Service centre
Clinic & pharmacy
Located in the 4-storey service centre
On-site sports area
Sports & leisure
Football, volleyball, pickleball and outdoor fitness

Warehouse, forklift, scale, meeting-room and canteen photos are illustrative; clinic and sports images are project renders.

Plug & Produce standard

Infrastructure commitments

Utility pipeline construction
Underground utilities · illustrative
Site levelling and road works
Site levelling, internal roads · illustrative
Substation
Power substation · illustrative
Central wastewater treatment
Modern environmental treatment technology
Separate collection
Separate stormwater and wastewater networks
Fire safety per QCVN 06
Designed to the latest national standard
Within 18 months
to complete technical infrastructure

Local foundations

Phuong Duc has an established population, economy and manufacturing culture

60.281
people across 44.69 km²
~4.4×
the national average population density (1,349 people/km²)
~300
companies and 5,000+ household businesses
5
craft-village groups: figurines, rattan & bamboo, woodwork, light metalwork, packaging
Craft-village workersWoodworking shop

A workforce used to manufacturing, processing and finishing · illustrative

Project legal documents

Legal status

Established by Decision 4033/QĐ-UBND of the Hanoi People’s Committee

On 5 August 2026, the Hanoi People’s Committee established the 71.3 ha industrial cluster in Phuong Duc commune. The infrastructure developer and tenants enjoy incentives under the Law on Investment and Decree 32/2024/NĐ-CP.

Get the project pack
Legal documents, master plan and brochure – emailed within minutes
Download brochure

Render gallery

Hanip 1, as planned

View full library
Hanip 1 main gate
Main gate
Management centre
Management centre
Street in front of the service centre
Service centre
Central plaza
Plaza & greenery
Street-front factory
4-storey factory
Side gate and checkpoint
Gate & checkpoint
Hanip 1 at night
Night view
Hanip 1 main gate
Main gate – option 2
South Hanoi expressway links
Expressway links · illustrative
Aerial view of the cluster
Aerial site view
Service row at night
Service area at night
Canal-side service centre
Canal-side service area

Get early-phase pricing & incentives

Leave your details and our team will send the legal pack and project documents, and advise on a layout that fits your scale.

Hotline: 0911.202.416
Sales office: 8th floor, 221B Tran Dang Ninh, Cau Giay, Hanoi

Hanip 1

Phuong Vu village, Phuong Duc commune, Hanoi
Developer: HANIP & UDIC joint venture

Project & products
Overview · Location · Master plan
Products · Investors
Investment info
Incentives · Process
Documents · FAQ · News
Contact
0911.202.416
Facebook · YouTube · Zalo
Information based on Establishment Decision 4033/QĐ-UBND dated 5 Aug 2026 of the Hanoi People’s Committee. Information and images are illustrative and may change at the developer’s discretion; official terms are set out in the contract.
Zalo